Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 18 Online
» 1138 Today
» 4397 Yesterday
» 18941 Week
» 71957 Month
» 191484 Year
» 3218337 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From
Pre TOPS (Pre Tops) E3187 17/10/1965
TOPS (86/0) 86034 03/1974
TOPS (86/4) 86434 13/12/1985
TOPS (86/6) 86634 11/04/1990

Locomotive Specifics
Class 86
Rebuild History
ClassFrom
86/017/10/1965
86/413/12/1985
86/611/04/1990
Wheels Bo-Bo
Builder English Electric Vulcan Foundry
Works Number 3479/E325
To Service 17/10/1965
Withdrawn 05/2002
Time in Service 36 yrs, 6 mths , 13 dys
Cut Up 01/03/2005
Cut At C F Booth Rotherham
Status Scrapped

Allocations
Code Name Date From
  (New) on 17/10/1965
   Withdrawn on 05/2002

Modifications
Date Modified Order Number Modification Status Charged to Capital Charged to Revenue Total Cost
06/1977   Ballast weights fitted to bogies        

Configuration
Configuration Date Configuration Description Additional Source
17/10/1965 xe Dual braked, Electric Train Heating    


Summary
Date Event Details Source See Also
17/10/1965 To Service To service as British Railways number E3187
Built at English Electric Vulcan Foundry, Works Number 3479
   
03/1974 Renumbered Renumbered to 86034    
06/1977 Modification Modification: Ballast weights fitted to bogies    
13/12/1985 Renumbered Renumbered to 86434    
11/04/1990 Renumbered Renumbered to 86634    
05/2002 Withdrawn Condemned as 86634    
01/03/2005 Scrapped Broken up by C F Booth: Rotherham    

prev prev