Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 9 Online
» 560 Today
» 4616 Yesterday
» 31210 Week
» 129855 Month
» 332519 Year
» 3359372 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D234 25/09/1959  
TOPS (Tops) 40034 02/1974  

Names Carried
Name Date From
ACCRA 16/06/1962

Locomotive Specifics
Class as Built 40
Subclass/Rebuild History
ClassFrom
4025/09/1959
Wheel Arrangement 1Co-Co1
Builder English Electric Vulcan Foundry
Fittings (as built)
Train Brakes Vacuum Brakes fitted
Steam Boiler Stone OK4625
Multiple Fitting Blue Star
Other Details Disc Route Indicators
To Service 25/09/1959 to Crewe North (5A)
Withdrawn 06/01/1984
Time in Service 24 yrs, 3 mths , 12 dys
Cut Up m/e 03/1984
Cut At Locomotive Works (Doncaster)
Information Bogie fractures
Status Scrapped

Liveries Carried - WIP
Code Colour Date From
GNP All over Green including front of cab 25/09/1959
GFYE Green with full yellow cab front or nose by 06/1969

Allocations - WIP
Code Subsequent Codes Name From Date
5A   Crewe North (New) on 25/09/1959
8A   Edge Hill w/e 24/10/1959
1F   Rugby w/e 09/01/1965
WL   Western Lines (LMR) on 18/04/1966
D05   Stoke Division on 17/06/1968
D09   Manchester Division w/e 09/11/1968
     Withdrawn on 06/01/1984

Modifications - WIP
Date Modified Order Number Modification Status Charged to Capital Charged to Revenue Total Cost
by 06/01/1970   Steam heat boiler isolated        
by 30/08/1970   Steam heat boiler isolated        
22/05/1972   Air Brakes fitted        
12/1972   Steam heat boiler reinstated        

Configuration - WIP
Date Configuration Description Additional Diagram Source
25/09/1959 vb Vacuum brakes, Steam heat      
by 06/01/1970 vi Vacuum brakes, Isolated boiler      
by 30/08/1970 vi Vacuum brakes, Isolated boiler      
22/05/1972 xi Dual brakes, Isolated boiler      
12/1972 xb Dual brakes, Steam heat      


Summary
Start Event Details Source See Also
25/09/1959 To Service To service as British Railways number D234
Built at English Electric Vulcan Foundry
Allocated to Crewe North (5A)
Livery applied: All over Green including front of cab
   
24/10/1959 Allocation Reallocated to Edge Hill (8A)    
16/06/1962 Naming Named 'ACCRA'    
09/01/1965 Allocation Reallocated to Rugby (1F)    
18/04/1966 Allocation Reallocated to Western Lines (LMR) (WL)    
17/06/1968 Allocation Reallocated to Stoke Division (D05)    
09/11/1968 Allocation Reallocated to Manchester Division (D09)    
06/1969 Livery Change of livery to Green with full yellow cab front or nose    
06/01/1970 Modification Modification: Steam heat boiler isolated    
30/08/1970 Modification Modification: Steam heat boiler isolated    
22/05/1972 Modification Modification: Air Brakes fitted    
12/1972 Modification Modification: Steam heat boiler reinstated    
02/1974 Renumbered Renumbered to 40034    
06/01/1984 Withdrawn Condemned as 40034    
03/1984 Scrapped Broken up by Locomotive Works: Doncaster    

prev prev