Menu
Quick Search
Enter locomotive number in the box below and press 'Go'!
In Touch
Donations
Counter
Visitor Statistics
|
» 16 Online
» 736 Today
» 4163 Yesterday
» 14142 Week
» 67158 Month
» 186685 Year
» 3213538 Total
|
Record: 10235 (26/09/2023)
(Free MySQL Counter)
|
GCR/LNER Robinson "C14" Class 4-4-2T
General
Designer |
John Robinson |
Introduced |
1907 |
Pre-Grouping Company |
Great Central Railway |
Grouping Company |
London and North Eastern Railway |
Description (1957) |
Class C14, an enlarged version of class C13, consisting of 12 locomotives built in 1907 and later fitted with superheaters. Several scrapped since 1957. |
Wheel Arrangement |
4-4-2T |
Number Built as C14 |
12 |
First in Service |
05/1907 |
Last in Service |
01/1960 |
Manufacturers |
|
|
|
|
Power
Variant Introduced |
1907 |
Tractive Effort |
17,100lbs |
Inside Cylinders |
18" x 26" (2 off) |
Inside Valves |
Slide |
Inside Motion |
Stephenson |
Wheels
Pony |
3' 6" |
Drivers |
5' 7" |
Truck |
3' 9" |
Locomotive Wheelbase |
29' 101⁄2" |
Total Wheelbase |
29' 101⁄2" |
Descriptive Wheelbase |
6' 0" + 7' 5" + 9' 1" + 7' 4½" = 29' 10½" |
Dimensions
Length (over buffers) |
40' 81⁄2" |
Weight (in running order) |
71t 0cwt |
Adhesive Weight |
37t 0cwt |
Maximum Axle Load |
18t 10cwt |
Water Capacity |
1,825gal |
Coal Capacity |
4t 6cwt |
Boiler & Firebox
Boiler Diagram |
22Sup |
Boiler Max Diameter |
4' 4" |
Boiler Barrel Length |
11' |
Boiler Pressure |
160lbs |
Boiler Pitch |
7' 91⁄2" |
Firebox Length |
6' 4" |
Firebox Grate Area |
19.59ft2 |
Firebox Heating Surface |
108ft2 |
Tube Number |
90 |
Tube Diameter |
17⁄8" |
Tube Area |
503ft2 |
Flue Elements |
18 |
Flue Diameter |
51⁄4" |
Flue Area |
282ft2 |
Total Evaporative Area |
893ft2 |
Superheater Elements |
18 |
Superheater Element Diameter |
11⁄16" |
Superheater Element Area |
138ft2 |
|