GWR Collett "5101" Class 2-6-2T
Locomotive ConstructionThe following graph shows the number of locomotives built by year. The first locomotive was delivered in November 1929 and the last in December 1949. A total of 140 locomotives were built between 1929 and 1949. |
Locomotive WithdrawalsThe following graph shows the number of locomotives withdrawn by year. The first locomotive was withdrawn in April 1956 and the last in November 1965. A total of 140 locomotives were withdrawn between 1956 and 1965. |
Class LifespanThis graph show the relationship between builds and withdrawals. The first locomotive was built in November 1929 and the last was withdrawn in November 1965. |
Class StockThis graph shows the number of locomotives in this class, by year, over the entire lifespan of the class. This information illustrates how rapidly/slowly a class may have been constructed or withdrawn from service. |